The repair and installation was carried out to fire and smoke seals. This included the installation of fire collars to uPVC pipes, fire rated mastic to service risers, fire board enclosures and fire pillows to penetrations complete with log book inspection register as per AS1530.4, AS4072.1 and AS1851.

In additional to the fire seals works; Passive First also carried out an audit and repaired 20 fire dampers throughout the building. This included replacing mechanical fire dampers, installing intumescent fire dampers and replacing damaged fire spray to kitchen exhaust ducts. A fire damper schedule and a five year inspection plan was also created at completion of our works.