Tafe Building, St, Leonards

Tafe Building, St, Leonards

An existing office building was converted for the TAFE (Learning and Innovations Campus) where Passive First completed the installation of all mechanical fire dampers on behalf of the mechanical contractor. This included preparing the each penetration with lintels and additional brickwork. Fire stop barriers to insulated metal pipes complete with intumescent seals were also installed when passing through fire rated floors and walls.

Passive First installation was completed in accordance with AS1530.4, AS4072.1 and AS1682.2 that included an annual maintenance schedule and labelling as per AS1851. A compliance certificate at the completion of works was also provided. 