A compliance watch and technical consultant was provided to the principal contractor for the following; fire seals protecting openings in fire resisting components of buildings, fire damper repairs, lightweight construction, access panels and hoppers to fire resisting shafts. This consisted of weekly inspections which included 285 apartments (7 lifts) in a residential complex over 12 months. A full itemised compliance report allowed contractors to correct themselves and learn how to install passive fire stopping systems as per data sheet installation. Passive First also provided on going instruction and education to each contractor site installers. Final compliance documentation was submitted along with the creation of a fire seals log book and fire damper schedule as per AS1851.

Passive First also carried out the supply and installation of fire stopping systems to each of the electrical and communications riser over 7 lift lobbies ranging from 7-9 levels each (70 penetrations). This included sealing around large high voltage power cables and busbar penetrations. A compliance certificate & log book inspection register for penetration seals as per AS1851 was also created.

Back